Hyperscale Data Centers Designed for Density
Campuses specifically designed for the scale hyperscalers require.
Hyperscale data centers require a different kind of infrastructure
The digital infrastructure that powers traditional enterprise computing was never designed for hyperscale cloud and AI deployments. Today’s next generation workloads demand massive blocks of pre-secured power, extreme rack densities, campus-scale expansion capacity, access to ample financing and delivery timelines that legacy providers simply can't meet.
Some data center providers are scrambling to retrofit yesterday's infrastructure for the requirements of AI applications. That approach is costly, slow, and often structurally impossible. In a market where power is scarce and timelines are unforgiving, the wrong infrastructure decision doesn't just slow you down. It puts your entire hyperscale data center deployment roadmap at risk.
Pre-secured and near-term availability. EdgeCore establishes utility partnerships, land entitlements, and substation infrastructure well ahead of schedule. When you're ready to deploy, the power is already there.
Power
Built for AI-scale rack densities. Our campuses support rack densities well over 50 kW, with infrastructure designed to accommodate direct-to-chip liquid cooling as GPU thermal requirements continue to climb.
Density
Campus capacity built for growth. EdgeCore’s data center design is engineered for 300+ MW of total capacity. Whether you're expanding a training cluster or deploying inference at scale, we have the room to grow with you.
Scale
From agreement to activation, faster. Pre-permitted sites, secured power, and repeatable designs mean we compress timelines that others can't. EdgeCore delivers capacity when you need it, not years from now.
Speed
Every EdgeCore campus offers access to low-latency fiber connections, major cloud hubs and population centers, ensuring the network and technical manpower to support the full spectrum of AI and cloud applications.
Proximity
Zero customer milestones missed. Our track record speaks for itself. In a market full of promises, EdgeCore delivers.
Certainty
Built to deliver what hyperscalers demand
EdgeCore develops and operates high-density, single-tenant data centers exclusively for the world’s largest cloud and AI companies. With data center industry veterans at the helm and ample financial backing, we take a disciplined approach to securing land, power, and community support before construction begins. Safety is no secret. Execution is our cornerstone.
0
U.S. Markets
0+ MW
Campus Design
0%
Customer Milestones Met
Locations that matter
EdgeCore's six U.S. markets were chosen for their combination of available power, land suitable for 300+ MW campuses, and proximity to hyperscale demand. With data center supply constraints tightening exponentially, EdgeCore’s near-term power and construction delivery dates are some of the earliest in the industry.
Ashburn, VA
114 MW
685K Sq. Ft.
2 Data Centers
Culpeper, VA
196 MW
920K Sq. Ft.
2 Data Centers
Louisa County, VA
1.1+ GW
3.1M Sq. Ft.
6 Data Centers
Phoenix, AZ
496 MW
2.7M Sq. Ft.
5 Data Centers
Reno, NV
216 MW
1M Sq. Ft.
3 Data Centers
Silicon Valley, CA
72 MW
540K Sq. Ft.
2 Data Centers
Frequently asked questions
What is a hyperscale data center?
A hyperscale data center is a purpose-built facility designed to deliver large, scalable compute capacity for cloud, AI, and enterprise workloads. Hyperscale data centers are designed for high-density environments, single tenant operations, and may scale to over 100MW.
How is a hyperscale data center different from a traditional data center?
Hyperscale data centers differ from traditional facilities in scale, density, and design. Traditional data centers are built for lower power densities, multi-tenant use, and are typically less than 30MW. Hyperscale data centers are single tenant, designed for rapid scale, high-density compute, and range from 72MW to well over 100MW.
What companies use hyperscale data centers?
Hyperscale data centers are designed for the world's largest cloud, AI, social media, and digital platforms. They support core cloud services, large-scale model training, and deliver content globally. EdgeCore builds and operates data centers exclusively for the largest cloud and AI companies, delivering single-tenant campuses purpose-built to meet their exact performance, scale, and deployment requirements.
What cooling technologies do hyperscale data centers use?
Modern hyperscale data centers deploy multiple cooling approaches including air-cooled systems with hot/cold aisle containment, close-looped chilled water systems, and direct-to-chip liquid cooling (DLC) for high-density AI workloads. EdgeCore's facilities are designed to support rack densities well over 50 kW with infrastructure capable of accommodating DLC and are cooled by ultra-efficient closed-loop chilled water systems that require nearly no water to recharge effectiveness.
Where are hyperscale data centers located?
Hyperscale data centers require locations with three critical factors: available power capacity (100+ MW), proximity to network interconnection points and access to skilled labor and construction resources. EdgeCore's six U.S. markets were chosen for their combination of available power, land suitable for 300+ MW campuses, and proximity to hyperscale demand centers.
How long does it take to build a hyperscale data center?
Building a hyperscale data center typically requires 36+ months from groundbreaking to activation, though this timeline can extend significantly if power procurement and site permitting aren't completed ahead of construction. EdgeCore accelerates delivery through pre-permitted sites, secured power allocations, and repeatable design standards. Pre-investment in land, power, and community support before construction begins enables EdgeCore to compress timelines that others can't.
What makes EdgeCore's hyperscale data centers different?
EdgeCore develops high-density, single-tenant hyperscale data centers exclusively for the world's largest cloud and AI companies. With data center industry veterans at the helm and ample financial backing, EdgeCore takes a disciplined approach to securing land, power, and community support before construction begins. EdgeCore has never missed a customer milestone, delivering certainty in a market where execution is everything. Every campus is designed for 300+ MW capacity with infrastructure supporting both current and future AI workloads.
Can hyperscale data centers support AI workloads?
Yes. Modern hyperscale data centers are increasingly designed to support AI workloads and next generation cloud applications. This requires higher rack densities, advanced cooling systems capable of handling GPU thermal loads, and flexible infrastructure that can accommodate both training clusters and distributed inference deployments. EdgeCore's campuses support the full spectrum of hyperscale needs, from traditional cloud to the most demanding AI applications.
How do hyperscale data centers achieve high efficiency?
Hyperscale data centers achieve efficiency through multiple strategies: modular, repeatable designs that reduce construction costs and timelines, advanced power and cooling systems that minimize waste, automation that reduces operational overhead, and economies of scale that spread fixed costs across massive capacity. EdgeCore's hyperscale facilities are designed to meet LEED standards with optimized PUE and WUE ratings through continuous design evaluation in each market.
What rack densities can hyperscale data centers support?
Modern hyperscale data centers support rack densities 50+ kW and greater, depending on workload requirements, with AI-focused facilities supporting even higher densities. EdgeCore's campuses support rack densities required for the latest cloud and AI technologies.